{"id":68221,"date":"2021-11-08T16:43:03","date_gmt":"2021-11-08T21:43:03","guid":{"rendered":"https:\/\/canada-info.ca\/?p=68221"},"modified":"2021-11-08T16:43:03","modified_gmt":"2021-11-08T21:43:03","slug":"cable-laying-ships-arrival-kicks-off-construction-phase-for-connected-coast","status":"publish","type":"post","link":"https:\/\/canada-info.ca\/en\/cable-laying-ships-arrival-kicks-off-construction-phase-for-connected-coast\/","title":{"rendered":"Cable-laying ship&#8217;s arrival kicks off construction phase for Connected Coast"},"content":{"rendered":"<p><span style=\"font-weight: 400\">The <\/span><a href=\"https:\/\/connectedcoast.ca\/\"><span style=\"font-weight: 400\">Connected Coast project<\/span><\/a><span style=\"font-weight: 400\"> has begun its construction phase now that the cable-laying ship CanPac Valour has arrived, a key element in delivering high-speed internet to nearly 140 remote communities in British Columbia.<\/span><\/p>\n<p><span style=\"font-weight: 400\">The ship will be placing subsea fibre optics cable along more than 3,400 kilometres of coastal BC. According to <\/span><a href=\"https:\/\/news.gov.bc.ca\/releases\/2021CITZ0050-002073\"><span style=\"font-weight: 400\">the provincial government<\/span><\/a><span style=\"font-weight: 400\">, the coastal subsea network will be one of the longest in the world, reaching all the way to Haida Gwaii and around Vancouver Island.<\/span><\/p>\n<p><a href=\"https:\/\/www.citywest.ca\/\"><span style=\"font-weight: 400\">CityWest telecommunications<\/span><\/a><span style=\"font-weight: 400\"> is managing and implementing the $45.4-million project in partnership with the <\/span><a href=\"https:\/\/srd.ca\/connected-coast\/\"><span style=\"font-weight: 400\">Strathcona Regional District<\/span><\/a><span style=\"font-weight: 400\">.\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400\">Dino Tsakonas, regional manager for CityWest, explained that last-mile construction of infrastructure connecting homes on Cortes Island to the future network was rescheduled from this fall to January 2022 due to a shortage of materials. Residents who have not yet signed up can still do so, as CityWest is offering this service at no charge during the bulk installation.<\/span><\/p>\n<p><span style=\"font-weight: 400\">The Connected Coast project was announced in 2018 and is scheduled for completion in 2023. It aims to bring high-speed internet connectivity to some 139 rural and remote coastal communities, 48 of which are Indigenous. On Cortes, the fibre optics cable will come out of the water at four locations: Seaford, Klahoose, Whaletown and Manson\u2019s.<\/span><\/p>\n<div id=\"attachment_68233\" style=\"width: 1272px\" class=\"wp-caption aligncenter\"><a class=\"dt-pswp-item\" href=\"https:\/\/canada-info.ca\/wp-content\/uploads\/2021\/11\/Connected-Coast-map.png\" data-dt-img-description=\"CityWest is working with Cortes neighbours Quadra, Denman and Hornby Islands to localize the project. Photo via Connected Coast.\" data-large_image_width=\"1262\" data-large_image_height=\"828\"><img aria-describedby=\"caption-attachment-68233\" class=\"wp-image-68233\" src=\"https:\/\/canada-info.ca\/wp-content\/uploads\/2021\/11\/Connected-Coast-map-1024x672.png\" alt=\"A map of Canada's west coast shows planned locations of subsea fibre-optic internet cable.\" width=\"735\" height=\"482\" srcset=\"https:\/\/canada-info.ca\/wp-content\/uploads\/2021\/11\/Connected-Coast-map-1024x672.png 1024w, https:\/\/canada-info.ca\/wp-content\/uploads\/2021\/11\/Connected-Coast-map-500x328.png 500w, https:\/\/canada-info.ca\/wp-content\/uploads\/2021\/11\/Connected-Coast-map-320x210.png 320w, https:\/\/canada-info.ca\/wp-content\/uploads\/2021\/11\/Connected-Coast-map.png 1262w\" sizes=\"(max-width: 735px) 100vw, 735px\" \/><\/a><p id=\"caption-attachment-68233\" class=\"wp-caption-text\">CityWest is working with Cortes neighbours Quadra, Denman and Hornby Islands to localize the project. Photo courtesy of Connected Coast.<\/p><\/div>\n<p>&nbsp;<\/p>\n<p><strong>Listen to the CKTZ News update below:\u00a0<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Connected Coast project has begun its construction phase now that the cable-laying ship CanPac Valour has arrived, a key element in delivering high-speed internet to nearly 140 remote communities in British Columbia. The ship will be placing subsea fibre optics cable along more than 3,400 kilometres of coastal BC. According to the provincial government,&hellip;<\/p>\n","protected":false},"author":127,"featured_media":68231,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":[],"categories":[217],"tags":[8304,8303,1058,10538],"radio":[252],"origine":[280,266,231],"acf":[],"_links":{"self":[{"href":"https:\/\/canada-info.ca\/en\/wp-json\/wp\/v2\/posts\/68221"}],"collection":[{"href":"https:\/\/canada-info.ca\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/canada-info.ca\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/canada-info.ca\/en\/wp-json\/wp\/v2\/users\/127"}],"replies":[{"embeddable":true,"href":"https:\/\/canada-info.ca\/en\/wp-json\/wp\/v2\/comments?post=68221"}],"version-history":[{"count":0,"href":"https:\/\/canada-info.ca\/en\/wp-json\/wp\/v2\/posts\/68221\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/canada-info.ca\/en\/wp-json\/wp\/v2\/media\/68231"}],"wp:attachment":[{"href":"https:\/\/canada-info.ca\/en\/wp-json\/wp\/v2\/media?parent=68221"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/canada-info.ca\/en\/wp-json\/wp\/v2\/categories?post=68221"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/canada-info.ca\/en\/wp-json\/wp\/v2\/tags?post=68221"},{"taxonomy":"radio","embeddable":true,"href":"https:\/\/canada-info.ca\/en\/wp-json\/wp\/v2\/radio?post=68221"},{"taxonomy":"origine","embeddable":true,"href":"https:\/\/canada-info.ca\/en\/wp-json\/wp\/v2\/origine?post=68221"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}